We have recently started renovating the cool season tee on number 9 on the River course. We attempted to rebuild the tee in the fall of 2018 to help with drainage issues and to re-establish grass on the tee. The tee struggled over the 2019 season and it has come time to give it another shot. Over the last week in September we began clearing the tee top of all unwanted sand and weeds to create the desired surface for the new tee box. The next steps in the process will be to level the tee and lay down bentgrass sod. We believe that bentgrass will survive better in the current location, and it will make for a much better playing surface. Also by using sod instead of seed the tee will be open for play much sooner.
No comments:
Post a Comment